Products Installation

Moisture Control

Product Overview

When installing flooring in areas where subfloor moisture is a problem, traditional damp proofing methods can take as long as 1 or 2 days. With the UZIN L3 Gold Moisture Control System floors can be installed in as little as 4 hours and is ideal for projects with time constraints or refurbishment work. The system has been developed to improve UZIN L3 Gold in areas of high moisture (up to 90% RH with 1 coat of primer or up to 95% RH with 2 coats) and is exceptionally simple to use.

Moisture Control

Downloads